A RESIDENT of Graytown is up in arms over a lack of information being provided over a planned construction of a telecommunications tower near his property.
DIGITAL connectivity continues to be poor throughout the Strathbogie region with a local survey of businesses showing an overwhelming frustration with dropouts or slow service speeds of the National Broadband Network (NBN).
THE towns of Longwood and Locksley have claimed a win, after the community was advised that only one superload carrying concrete for the West Gate Tunnel Project from Benalla will now be driven through the town in May next year.
LONGWOOD and Locksley residents have vented their frustrated over a decision made last week to have giant superloads holding concrete pieces trucked through their towns at a slow pace.
ROADS and infrastructure in the Strathbogie region are set to benefit from a Federal Government grant of $1,439,568 to help accelerate priority projects.